Prefabricated houses of the Pure and Prime lines
We are presenting our new lines of typical houses

New range of Marles houses

Prefabricated house Montmartre
Forever mine is not a line. It is the way to the house of your dreams. Plan with us.

Forever mine

Marles individual house
Individual house

Forever mine

Your home, your way. The freedom of personalised living in our Individual Homes.
Do you have an uneven or unusual shaped plot?
Do you want a sauna and freestanding bath as part of your bedroom?
Do you have an architect’s plan and seek a turnkey solution?

Sustainability matters to us

Building Green-ovative homes for more then 100 years

64% of materials from Marles home is recyclable

100% of wood comes from European Forests

80 years of building homes in the heart of Slovenia's Pohorje forests

Innovative Engineering

Easily incorporate the latest concept of living into the design of your dream home

Key benefits of
timber construction

TIME EFFICIENCY
Thoughtful planning, production in a controlled environment
CLEAN AND EFFICIENT ASSEMBLY PROCESS
Pre-manufactured walls allow for a clean and fast installation without waste and mess (unlike traditional construction)
LIGHTWEIGHT CONSTRUCTION ELEMENTS
Optimal for renovations – also with the possibility of adding floors. Suitable for future adaptations
SUSTAINABLE CONSTRUCTION
Positive impact on the environment. Use of natural materials with a negative CO2 footprint

Marles Architectural Studio

Whether you opt for a fully customized custom wooden house or a house from our catalog, Marles Architecture Studio is the first step on the way to your dream home.

How to create your dream home, with Marles

1

Discover the benefits of sustainable, manufactured timber homes, with Marles

1 appointment
Idea
2

Design your dream home or choose from a selection of pre-designed models

1-3 months
Planning
3

Offer: Select the construction phase, define the scope of works

1 month
4

Sign the contract

1 week
5

We prepare the necessary documentation

2-6 months
Construction
6

A home in the making: The construction elements are manufactured in a controlled environment

2 months
7

Ground preparation and foundation slab: Prepare the building site and the foundation slab

3 months
8

Installation of the house: It starts under the vigilant eye of the site manager

2 weeks
9

Execution of the craftwork: heating, screed, parquet, tiles, etc.

4-6 months
Completion
10

Handover, moving in and enjoying your new home

1 month

Start a project with us

Free consultation on choosing your future home